亚洲国产精品成人综合久久久久久久久精品免费看片国产欧美久久久久久精品一区二区三区_成人精品一区二区91毛片不卡_99久久精品无码一区二区毛片免费_亚洲国产成人精品女人久久久国产美女久久久

OT-2 Liquid Handling Robot Safety and Regulatory Compliance Information

OT-2液體處理機(jī)器人
Opentrons Labworks Inc. Rev. OT-2R, May 2021

Please read this operation manual carefully before using OT-2

The product warranty will be void if the following warnings, precautions and proper operating instructions are not followed. It can also cause operator injury and result in safety, reliability and performance hazards within the OT-2 system. The company does not assume responsibility.

Precautions:

1. This product must use the power adapter that comes with the power supply or the power supply specification of the same model. It is strictly prohibited to use power supplies with inconsistent specifications and models. 2. Electronic equipment is not allowed to be modified or altered without permission; if you need to expand or change functions, please communicate with the company's professionals. 3. When conducting experiments, all laboratory equipment and hardware decks must be placed within the effective working range of the work surface. 4. After the program is set, do not put your hands inside the OT-2 when the machine is running normally to avoid damage to the machine or injury to people or other objects. 5. Do not spray liquid on the product or otherwise make it wet. 6. When cleaning and maintaining the machine, be sure to turn off the machine and disconnect the power supply before proceeding.

Equipment Ratings

Possible Use The Opentrons OT-2 is an affordable, easy-to-use robotic liquid handler for research laboratories. OT-2 automated ordinary wet method

Laboratory protocols can free laboratory scientists from the tedious physical labor of work. This guide will help you learn how to get the most out of it, or visit www.opentrons.com for more information.

  • Safe use regulations
  • Please refer to these specifications and compliance guidelines to ensure safe use of the OT-2, which includes the following safe use specifications
  • All input and output connections of the product and its power supply, electrical inputs and PC connections, as well as a warning label on the module with this information:
  • Do not replace IEC wires unless instructed to do so by Opentrons Customer Support.
  • AC IEC power supply is connected to a power source with a ground. Make sure the outlet or circuit has a ground/protective ground.
  • USB: Users can connect the Opentrons module to the USB port on the back of the machine
  • Ethernet network connection. User connects to computer via Ethernet
  • Do not lift or move the OT-2 without help

Table 1. Technical specifications

技術(shù)規(guī)格
技術(shù)規(guī)格

Table 2. Input Ratings (DC)

A. Maximum power (W) 220 Watts Maximum power (VA) 36 VDC Maximum current 6.1A

Security and Regulatory Compliance

Safety Warning Labels Warning labels posted on the OT-2 and in this manual warn you of potential harm or sources of harm. The instructions for each safety warning label are referenced in the table.

Table 3. Instrument safety warning labels

儀器安全警告標(biāo)簽

Table 4. Instrument Safety Warnings

儀器安全警告

Table 5. Environmental conditions

環(huán)境條件

Compliance Standards

  • The OT-2 and its accessories have been tested and comply with all applicable requirements of the following safety and electromagnetic standards:
  • IEC/UL/CSA/EN 61010-1:2001 Electrical safety requirements for equipment for measurement, control and laboratory use - Part 1: General requirements
  • IEC/UL/CSA/EN 61010-2-010:2015 Ed.3 Safety requirements for electrical equipment for measurement, control and laboratory use - Part 2-010: Special requirements for laboratories
  • IEC/UL/CSA/EN 61010-2-051:2015Ed.3 Safety requirements for electrical equipment for measurement, control and laboratory use Part 2-051: Particular requirements for mixing and stirring laboratory equipment

Electromagnetic Compatibility (EMC)

  • IEC61326-1:2013 Electrical equipment for measurement, control and laboratory use - EMC requirements, Class A
  • EN 61000-3-2:2014 Electromagnetic compatibility (EMC) - Part 3-2: OT-2: Safety and regulatory compliance information
  • IEC/UL/CSA/EN 61010-2-010:2015 Ed.3 Safety requirements for electrical equipment for measurement, control and laboratory use - Part 2-010: Special requirements for laboratories Material heating equipment
  • IEC/UL/CSA/EN 61010-2-051:2015Ed.3 Safety requirements for electrical equipment for measurement, control and laboratory use Part 2-051: Special requirements for mixing and stirring laboratory equipment Electromagnetic compatibility (EMC) limitations - Harmonic current emission limits
  • en 61000-3-3:2013
  • KN 61000-6-3:2012
  • en 61000-3-2:2014
  • IEC 61000-3-3:2013 Ed.3+A1
  • IEC 61000-6-1*AEI
  • en 61000-3-3:2008
  • FCC Part 15, Subpart B, Sections 15.107 and 15.109 as a Class A digital device
  • IC ICES-003:2016Ed.6 Information technology equipment (including digital equipment)—Limitations and methods

Original address:OT-2 Liquid Handling Robot Safety and Regulatory Compliance Information

Contact Us

The experienced service team and strong production support team provide customers with worry-free order services.

宜良县| 出国| 汾阳市| 昂仁县| 那曲县| 开封市| 仙游县| 平武县| 荆州市| 龙井市| 扬中市| 达日县| 闸北区| 福贡县| 永靖县| 罗江县| 贵州省| 北海市| 固阳县| 喀什市| 万年县| 山东| 岳阳市| 叙永县| 邵东县| 高要市| 明光市| 刚察县| 巴林右旗| 天祝| 会同县| 吉林市| 南部县| 西吉县| 华池县| 伊金霍洛旗| 文成县| 五台县| 旺苍县| 兴仁县| 新乡市|